MMD Offshore

 

Bottle racks allow bottles to be held individually by removable clamps to comply with the Oil Majors’ new lifting requirements for gas bottle transportation. The bottle racks have an access door and hinged ramp to allow for easy loading of gas bottles by personnel. With forklift pockets in both directions it allows for easy handling on site. The covered frame arrangement provides the best protection for project gas bottles from impacts caused during crane lifting operations.



 

Capacity: Extensive range of sizes available
Vessel material: Carbon Steel
Approvals:DNV2.7,EN12079,IMO MSC/Circ.860
Overviews:
• Fixed position according to bottle size
• Cargo restraining nets available if required
• Net securing points on all units
• Drainage points are standard
• Removable apron in order to move bottle easily
• Anti-slip surfaces on both floors and roofs


MMD OFFSHORE ENGINEERING ©2012-2018|Privacy Policy
沪公网安备 31011402001152号 沪ICP备11020479号